top of page

My Bath Tub Tile Reno -Day 4

Well, all the tile is up but this project isn't over yet, even though it looks all set. I need to let the tiles cure for 24-48 hrs and then I'll do the grouting, which is a mess. Finally I'll have to caulk, put the shower fixtures back on, hang the curtain rod and shower curtains, and put my bathroom back together again.

I am thrilled with the result but I would NEVER do this project for a client. It's way too much work, too much time and too costly for them. I'm on Day 4 and I still have 6-8 hours to go. I've spent about $400 on supplies and I still have to figure out what to do with all my demo waste.

I am thrilled with the results but it ain't done yet. That last 20% kills me.

Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page